Hazardous areas installation
Ridge Street Upgrade
The Ridge Street upgrade forms part of Bega Group’s long-term manufacturing strategy, enabling the consolidation of production into a more efficient facility designed to support future growth. The project increased manufacturing capability, improved operational efficiencies and strengthened one of Australia’s most significant dairy production sites through a $50 million capital investment.
Scope of works
-
-
-
-
-
- Designed & manufactured the Main Control Cabinet.
- Installed equipment within a Hazardous Area (Ex) facility.
- Delivered a complete Ex compliance dossier.
- Integrated new conveyor systems.
- Commissioned the electrical and control systems.
-
-
-
-
$ capital investment
%
on time and budget
Durations (months)
%
location: nsw

Safety Focused
ENGINEERED SOLUTIONS
RELIABLE SUPPORT
BUILT TO LAST
Company


© 2026 Bonacci Electrical Pty Ltd (ABN 86 958 269 270) Trading As Bon Industry. All Rights Reserved.